Injured by a Dangerous Road or Sidewalk? California’s Government Claim Deadline

Most California injury claims run on a two-year clock, and most injured people plan around that number. Claims against a city, a county, the state, or another public entity do not work that way. Before any lawsuit can be filed against a public entity, a written claim has to be presented to the entity first, and for an injury claim that presentation deadline is six months, not two years. People with strong cases lose them every year on this single step, usually because they spent the first six months treating the injury and assumed the lawsuit deadline was the only one that mattered.

This post works through the sequence in order: what the six-month claim is and what presenting it involves, how to identify which entity actually owned or controlled the place where the injury happened, what has to be proved about a dangerous condition under Government Code section 835, what evidence to capture before the condition is repaired, what narrow relief exists if the six months have already run, and which deadline governs the lawsuit itself once a claim is presented and rejected.

The six-month claim comes first

Government Code section 911.2 sets the presentation deadline: a claim relating to a cause of action for death or for injury to a person or to personal property shall be presented to the public entity not later than six months after the cause of action accrues. Accrual is generally the date of the injury, not the date treatment ends and not the date a person first talks to a lawyer. Waiting until treatment is finished before presenting the claim is the most common way this deadline is missed, because a serious injury can easily take more than six months to treat.

Presenting a claim is a formal written step, not a phone call and not an incident report. Many entities publish their own claim form, and a claim generally has to identify the claimant, describe when and where the injury happened and how, describe the injury and loss, and state the amount claimed or whether the amount exceeds the jurisdictional threshold. The claim goes to the entity itself, delivered to the office or official the entity designates for claims, and proof of timely delivery should be kept. Two practical points follow from that. First, a police report, a complaint to a public works hotline, or a letter to the wrong office is not the same thing as a presented claim. Second, the entity then has a period to act on the claim, generally 45 days under Government Code section 912.4; if it does not act in that period, the claim is deemed rejected, and either way the rejection is what opens the door to a lawsuit.

No lawsuit against the entity can be filed until that claim step has happened. The claim is not a courtesy notice layered on top of the case. It is a condition the case depends on, which is why the six-month date belongs at the top of the file from the first consultation.

Naming the right entity is its own investigation

A stretch of road, a sidewalk, or a bikeway can belong to a city, a county, the state acting through Caltrans, or a special district, and the boundaries do not follow what a map app calls the street. A sidewalk in front of a house may sit in a city while the arterial two blocks away is a county road, and a highway ramp or frontage road may be state property inside city limits. Adjacent property owners can also matter: in many California cities, the owner of property fronting a sidewalk has a maintenance role under local ordinance, and a private party whose work or property contributed to the condition can be a separate defendant on the ordinary two-year clock.

Presenting the claim to the wrong entity does not preserve the claim against the right one. If six months run while a claim sits with a city for a spot the county controlled, the county claim is late even though the injured person acted early. Pinning down ownership and control of the exact spot is therefore first-week work: parcel and right of way records, city and county boundary and road records, Caltrans jurisdiction for highway segments, and the maintenance history for that location. Where ownership is genuinely uncertain between two entities, presenting a timely claim to each candidate entity is the conservative course, because a claim presented to an entity that turns out not to be responsible costs little, while a claim never presented to the responsible one can end the case. Background on how road crash claims are evaluated generally is on the Car Accidents page.

What has to be proved: dangerous condition and notice

Government Code section 835 sets the liability test for a dangerous condition of public property. A public entity is liable for injury caused by a dangerous condition of its property only if the plaintiff establishes that the property was in a dangerous condition at the time of the injury, that the injury was proximately caused by the dangerous condition, and that the condition created a reasonably foreseeable risk of the kind of injury that occurred. On top of that, one of two things about the entity’s own conduct has to be true: either a negligent or wrongful act or omission of an employee acting within the scope of employment created the condition, or the entity had actual or constructive notice of the condition under section 835.2 a sufficient time before the injury to have taken protective measures.

Notice is where these cases are usually won or lost. Actual notice is the straightforward version: prior complaints about the same spot, earlier incidents, work orders, or internal records showing the entity knew. Constructive notice turns on how long the condition existed and how obvious it was: a sidewalk slab raised for years, with visible cracking, patching history, and tree root growth, tells a different story from a defect that appeared the week of the injury. The records that prove notice are mostly the entity’s own, including complaint logs, inspection schedules and reports, maintenance and repair histories, and prior claims, which is one more reason the claim and the follow-on records requests should go out early, while the condition and the paper trail both still exist.

Not every defect qualifies. A condition has to be dangerous in the statutory sense, meaning it created a substantial risk when the property was used with due care in a reasonably foreseeable way. Trivial defects, the kind of minor variation in a walking surface that a person using due care would simply step over, are a recurring defense in sidewalk cases, and the size, visibility, and setting of the defect all feed that argument.

Evidence to capture in the first days, before the repair

Dangerous condition cases have a built-in evidence problem: the entity can fix the condition, and often does, once it has notice of an injury. The proof then depends on what was captured before the repair.

  1. Photograph and measure the condition itself. The height of a sidewalk lift, the depth and width of a pothole, the length of a broken section, photographed with a ruler, a coin, or another scale object in frame, from several angles and distances.
  2. Photograph the setting, not just the defect. Sight lines, lighting, shadows, signage or the absence of it, the condition of any markings, and what a person approaching the spot would actually see, at the same time of day if lighting played a role.
  3. Fix the exact location. The nearest address, cross streets, which side of the street, and distance from a fixed landmark, recorded while it is certain, because the entity investigation starts from that spot and a vague location can send it to the wrong segment.
  4. Report it and keep the paper. Any report to the city, county, or Caltrans, the claim form and proof of delivery, medical records, and the names of witnesses, including anyone who can say how long the condition was there.
  5. Do not assume the records will wait. Complaint and inspection records are obtained through requests that take time, and video from nearby businesses or transit vehicles is typically overwritten on short cycles if nobody asks for it.

If the six months have already run

Late-claim relief exists, and it is narrow, and it should be described that way. Under Government Code section 911.4, a person who missed the presentation deadline can apply to the entity for leave to present a late claim. The application has to be presented within a reasonable time, and not later than one year after the cause of action accrued; an application filed after that one-year mark is outside the relief scheme altogether. Under section 911.6, the board shall grant the application where one of the listed grounds applies, including that the failure to present the claim was through mistake, inadvertence, surprise, or excusable neglect and the entity was not prejudiced in its defense by the delay, that the injured person was a minor during all of the claim period, that the person was physically or mentally incapacitated during that period and failed to present a claim because of the disability, or that the person died before the period expired. The board generally acts within 45 days, and an application it does not act on is deemed denied.

If the entity denies the application, or it is deemed denied, the next step is a petition to the superior court for relief from the claim requirement under Government Code section 946.6, which generally has to be filed within six months after the application was denied or deemed denied. The court applies the same kinds of grounds, and prejudice to the entity’s defense is central. The honest summary for anyone reading this after the six-month date has passed: the calendar is unforgiving, the one-year outer limit for even asking is real, and this is a same-week conversation with a lawyer, not a wait-and-see item. On how case timelines run in practice once a case is moving, see How Long Will My Case Take?

After the claim: the lawsuit deadline is a different six months

Once a claim has been presented and rejected, the deadline to file the lawsuit is not the ordinary two years people expect. Under Government Code section 945.6, if the entity gives written notice of its action on the claim in accordance with section 913, the suit must be commenced not later than six months after the date that notice is personally delivered or deposited in the mail. If no such written notice is given, the suit must be commenced within two years from the accrual of the cause of action. The rejection letter therefore has to be read and calendared when it arrives, because in the usual case, where the entity sends its notice, the operative deadline is six months from that notice, and it runs regardless of where treatment or settlement talks stand.

Put together, the full sequence for an injury on public property is: identify the right entity, present a written claim within six months of the injury, track the entity’s action or the 45-day deemed rejection, and then file suit within six months of the written rejection notice if one is sent. Each step has its own clock, and missing any one of them can end a case that would otherwise be decided on its facts.

If you were hurt on a road, a sidewalk, or other public property in California, the useful first step is an urgent review built around two facts: the exact date of the incident and the exact location. Those two facts determine which entity has to receive the claim and how much of the six months is left. Contact us to start that review.

Free Case Evaluation

Free Case Review

  • This field is for validation purposes and should be left unchanged.

Attorney Q&A

Q: Government Code section 911.2 gives an injured person six months to present a written claim to a public entity, before any lawsuit can be filed. What does presenting a claim actually involve, and what do people most often get wrong about it, such as waiting until treatment is finished or assuming the two-year lawsuit deadline is the one that applies?

Presenting a claim is a formal written filing with the entity itself, usually on the entity’s own claim form, that identifies who was hurt, when and where it happened, how it happened, what the injuries and losses are, and the amount being claimed. What people get wrong starts with the calendar. They assume the two-year lawsuit deadline is the deadline, and the six months run while they are still treating. The second mistake is treating an informal contact as a claim. Calling public works, filing a police report, or sending a letter to a council office does not present a claim. The third is sending the claim to the wrong entity, which preserves nothing against the right one. By the time most of these mistakes surface, the six months are gone, and the conversation has shifted from the merits to whether late-claim relief is even available.

Q: A road, sidewalk, or bikeway can belong to a city, a county, the state (Caltrans), or a special district, and naming only the location is not enough. How do you pin down which entity owned or controlled the exact spot where someone was hurt, and what happens if the claim goes to the wrong entity?

The work is records work. We look at parcel and right of way records, city and county road and boundary records, and Caltrans jurisdiction for anything touching a highway, a ramp, or a frontage road, and we check who maintained that segment, because maintenance responsibility is often the clearest sign of control. Local ordinances matter too, especially for sidewalks, where the fronting property owner can share responsibility. If the claim goes to the wrong entity, the practical answer is harsh: the right entity’s six months kept running, and a claim it never received is a late claim. That is why, when the records leave real doubt between two entities, the safe move is to present a timely claim to both and let the ownership fight happen with both claims on file.

Q: Under Government Code section 835, liability for a dangerous condition usually turns on notice: the entity created the condition, or it knew or should have known about it in time to fix or warn against it. What evidence actually proves notice, for example prior complaints, work orders, inspection records, or how long the condition was visibly there, and what should an injured person capture in the first days (measurements, lighting, sight lines, photos) before the condition is repaired?

Notice is proved with the entity’s own paper and with time. Prior complaints about the same location, earlier incidents, work orders, inspection reports, and repair histories show what the entity actually knew. Constructive notice is built from the condition itself: how big it was, how visible, and how long the physical evidence says it had been there, because a lift or a break that developed over years is hard to square with a claim that a reasonable inspection would have missed it. What the injured person can capture, and nobody else can recreate later, is the condition before the repair: measurements with something in frame for scale, photos of the approach and the sight lines and the lighting at the relevant time of day, and the exact location fixed against an address or a cross street. Once the slab is ground down or the hole is filled, that proof is gone, and the case is argued from whatever was saved.

Q: What happens if the six months have already run when someone first calls a lawyer? Late-claim relief exists but is narrow. When is it worth pursuing, what does it require, and how does the deadline picture change once a claim is presented and rejected, compared with the ordinary two-year period people expect?

It is worth pursuing when the facts fit one of the statutory grounds and the application can still be filed inside the outer limit, which is one year from the injury. The application goes to the entity first, with the proposed claim and the reason for the delay: mistake, inadvertence, surprise, or excusable neglect without prejudice to the entity, or minority, incapacity, or death during the claim period. If the entity denies it, the fight moves to superior court on a petition, and the entity will argue prejudice, meaning evidence lost or witnesses gone because of the delay. Once a claim is presented and rejected, the picture changes completely: with a written rejection notice, the lawsuit deadline is six months from that notice, not two years from the injury. Clients are surprised by that in both directions. The claim step shortens the front end, and the rejection notice shortens the back end, and both dates have to be calendared the day they are known.